![]() ![]() ![]() So, the people who design buildings can decide if the soil needs any treatment to make it stronger or not. Soil geotechnical research is done to learn about soil properties, the different types of soil, and how much weight it can hold. Without knowing the nature of the soil, it is impossible to design anything. Soil Testing and Report investigation:īefore planning and designing any building project, the soil must be tested. For construction projects to go smoothly, the site must be ready for the building before work can begin.ġ. ![]() There may be a lot of obstacles on the construction site, such as old buildings or structures, big trees, sloping ground, loose soil, and underground services. Before the main building work begins, a construction site needs to be set up. Construction Work on preparing the site is important for any project. To get a construction site ready, blasting, test drilling, landfilling, leveling, earth-moving, excavating, land drainage, and other types of land preparation. Since the land and structures already there are suitable for the construction work that will soon begin there, site preparation is not required.īefore construction, the site must be prepared by demolishing old buildings, clearing building sites, mapping underground services and wires, doing a site survey and layout, and treating termites. The site cleared in preparation for the new building is called the old or unfriendly site. The term “site preparation” describes the actions taken before an engineer begins their work. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |